mark ii overview
The Mark II reactor fixed many of the leaking problems of the Mark I reactor. Despite this, it still had minor leaks. The innovations this reactor brought was through the first oil condensation and collection system I built. Additionally, I created a way of storing and compressing the output gas of the process.
watch Mark II In Action!
-
Construction: 3 months
Reactor Operation : 6 months -
Carbon Steel, Magnetron, Microwave Transformer, Fiberglass, Copper Pipes, Bolts, Nuts, Wires, Gas Compressor
-
The construction of gas storage and compression system.
The construction of an condenser to collect pyrolysis oils.
The construction of a filtering system to scrub pyrolysis gas
-
$1500 - $2000 USD